Construction Calculator
Rule-of-thumb site math, reviewed October 2026 — first-pass material estimates, not a bill of quantities or a code check. Confirm with your contractor or engineer.
Your files never leave your device
Check your Network tab and see
Work starts the moment you drop a file
No daily limit, no sign-up, no watermark
Keep all three dimensions in metres so the result is m³ of concrete. A 4 m × 3 m slab 0.15 m thick is 1.8 m³. Convert to bags using the yield your mix or supplier quotes — that factor is not baked in. For the hole you excavate before the pour, use the excavation calculator; soil volume and concrete volume are not interchangeable once sides slope or you add wastage.
The result is a cuboid: length × width × depth. Sloped footings and stepped rafts must be split into rectangles and added. Reinforcement, shuttering, pump-line waste, and bag yield are not fields. This is not soil to cart away — dug earth bulks, which the excavation page warns about separately.
It does not convert to bags, deduct steel, model sloped sides, or price the pour — and it never substitutes for the excavation figure, which measures a hole plus bulking, not a placement.
Cuboid pours only — steel, bags, and sloped sides are separate.
No. It is the cuboid volume of the pour. Reinforcement, shuttering, and pump wastage are separate estimates.
Multiply by the bag-yield your mix design or supplier quotes for the grade you are pouring — factors vary, so they are not baked in here.
Yes — a small margin (typically a few percent) covers shuttering gaps, spillage, and pump-line loss. Order exact volume plus that buffer.