Construction Calculator
Rule-of-thumb site math, reviewed October 2026 — first-pass material estimates, not a bill of quantities or a code check. Confirm with your contractor or engineer.
Your files never leave your device
Check your Network tab and see
Work starts the moment you drop a file
No daily limit, no sign-up, no watermark
The result is a cuboid: length × width × depth in metres. Trenches with sloped sides hold more than a vertical-sided box of the same bottom size — break those into parts. Once dug, soil typically occupies more volume than the in-situ hole (bulking); this tool does not apply a bulking percentage. For the concrete that later fills a footing, use the concrete calculator.
The figure is earth still in the ground. After digging, soil typically occupies more truck volume; this page does not apply a bulking percentage. Working space beyond the footing is not added. Convert to truck loads with the factor your hauler uses — it is not baked in.
It does not apply bulking, add working space, or book trucks — and it never doubles as the concrete figure, which is the exact pour placed inside the hole.
In-situ volume — bulking, working space, and trucking excluded.
Only if the pour is a perfect cuboid matching the hole and you ignore bulking and working space. In practice the dig is larger than the structural concrete — estimate them separately.
Divide the m³ (plus your bulking allowance) by the truck's per-trip capacity — your hauler's factor, which varies by vehicle and soil type.
Dug soil typically occupies around 20–30% more volume than in the ground — multiply the in-situ m³ by roughly 1.2–1.3 as a carting allowance, then confirm with your hauler.
No. They stay in the browser tab.
That is the promise behind every tool here. Files are read in your browser tab, processed there, and discarded when you close it — never uploaded to our servers.